Well, I finally got the dining room cleared to start the flooring. Today I finished the primer coat. I ended up using a roller to apply 2 coats. Not a bad deal at all once the floor was cleaned (man did THAT suck). Gotta wait minimum 8 hours to dry before next coat.REDBARNPIZZA:
I’ll let you know next week I have stripped my dining & server alley area of nearly 800 sq feet of the mastic goo from the 60’s. Long and tedious, but the product I found to use made it a lot simpler than it could have been.hey, anyone have any luck with concrete stain (for the dining area?)
I will be laying down a 3-part system on the concrete. Primer - stain - topcoat sealer. T<>
We are going this route for ease of application, cost and ease of decorative flourish that we can do ourselves without having to explain to a contractor. Plus, we have 5 different textures and generations of concrete to deal with, so the inherent visual interest of the concrete will be fun to use. We may regret it, but for a couple days’ work and $160 in materials . . . I’ll let you know how it goes.
Monday morning I put the stain on. Using a disposable string mop to swirl in on in a sort of patterned effect. If that looks dumb, I’ll use a roller to even it out. More on results to morrow. final will be topcoat poly enriched with epoxy.