NicksPizza
New member
I am looking over information from Coke today from a meeting my wife had with their rep. VERY helpful and pleasant person to work with according to Kim. It was a nice change of pace. I have a question from the infor I got.
There was the suggestion that our health department will require a floor drain within 3 feet of the dispenser. It looks like it is for ice-melt draining. Is this some sort of “requirement” where you are? I have been planning all along to use a drain line with a pump since it will be somewhere along 30’ of concrete to bust up to get to the tie-in to put a drain in the floor. I undertand about what amounts to backflow prevention on any drain that leads to something that will be involved in edibles. I just never really planned for a floor drain where we need the fountain set up. It is my intention to contact our health department this week to ask their opinion (as well as scope other setups in the county). I’m just getting the lay of the land for when I speak to our health lady. She is often receptive to effective discussions about options if they are a possibility.
That said, if we end up being required to have said floor drain, then we will find a different location for the fountain. It will be in our server alley, and not a “free feed” system. We are driving towards a market perception just a little above the self-serve sort of feel.
There was the suggestion that our health department will require a floor drain within 3 feet of the dispenser. It looks like it is for ice-melt draining. Is this some sort of “requirement” where you are? I have been planning all along to use a drain line with a pump since it will be somewhere along 30’ of concrete to bust up to get to the tie-in to put a drain in the floor. I undertand about what amounts to backflow prevention on any drain that leads to something that will be involved in edibles. I just never really planned for a floor drain where we need the fountain set up. It is my intention to contact our health department this week to ask their opinion (as well as scope other setups in the county). I’m just getting the lay of the land for when I speak to our health lady. She is often receptive to effective discussions about options if they are a possibility.
That said, if we end up being required to have said floor drain, then we will find a different location for the fountain. It will be in our server alley, and not a “free feed” system. We are driving towards a market perception just a little above the self-serve sort of feel.