Does anyone have a ballpark figure on the cost of adding a standard fryer (2 baskets) with a ventilation, hood, and fire suppresion? One person told me 20K and another told me 5K. Not sure which is more accurate.
Buy more hood than you expect to need. My original hood estimate was for 8 footer: $9500 (we had . . . issues . . . for installation). For $11,000, I got the 10 footer. Had I gone small, and just added on when I needed more, it would have cost about $4000+ to add a 4 foot hood later! Figure about $1000 per foot of installed hood system. Fryer would be whatever you could get a deal for. Probably get a used one less than $1K.Depends on the size of the hood and simplicity of installation, through a wall, up through the roof, length of ducting ect…
I would ballpark you more in a 8k - 12k range. For a 5ft - 8ft hood.
The cost for a 3ft - 4 ft hood isn’t that great of a savings and when you want to add more fryers or cooking equipment under there you’ll have the space.
About the only way to know for sure is to get an estimate :?
When you get your first hood quote, you will find out that the actual hood/fan costs are really tiny piece of the puzzle. You can save $300 to $1000 on the hood and/or fans by buying used. That is out of the overall $10,000 project cost. The installation and the fire suppression are where the real significant costs lay. Don’t let me dissuade you from saving money, but the $250 difference between galvanized and stainless is well worth it at the front end!Another thing to consider is a grease trap. If you don’t have one the health department may require it. One contractor quoted me 10k, but he thought they would let it go.
Just called my contractor. He going to check into the “floor mounted little thing”. Looks like that may save my butt. We have a new agency out here in California apart from the Health Department which just deals with waste and grease (gotta love our ever growing government here) that mentioned this a few months ago.pizzapirate:
\
GREASE TRAPS: Some municipalities require an in-ground trap like a septic tank. Ours allows a floor mounted little thing, which cuts my costs down to a few hundred if I want a new one. If you gotta go the in-ground versin, you are in for a treat and an expense. This may be a requirement regardless of ventless or vented fryers.
Canplas Endura Grease Interceptor used to have banner ads here on the 'Tank earlier this year. Their construction looks really good, and I’d have bought one of them if I didn’t already own a heavy steel one. When I upgrade, it will be to a plastic model like theirs.Just called my contractor. He going to check into the “floor mounted little thing”. Looks like that may save my butt. We have a new agency out here in California apart from the Health Department which just deals with waste and grease (gotta love our ever growing government here) that mentioned this a few months ago.
OUCH! :shock: Gotta love California health and environmental codes, eh?My contractor got word from the health department about putting in the 8’ hood with fryers.
They would want a grease intercepter put in which would run about 15k. Then they want a floor sink for the walk-in. Since we would be doing all this work they want us to change out our 2 compartment sink for a 3 compartment “and” put in an additional prep sink. Our floor is not consistent with today’s codes so they said they would think about that. They want full achetectual and mechanical plans. They also want us to get our shelving back up to 32’ again. They are checking with their supervisor on whether they will require us to put in public restrooms.
Fun stuff.
The floor sink for the walk-in? Mop sink? The State Health Department is a phone call away. Give them a buzz. 32’? My Goodness! I’d like to chat with your contractor!My contractor got word from the health department about putting in the 8’ hood with fryers.
They would want a grease intercepter put in which would run about 15k. Then they want a floor sink for the walk-in. Since we would be doing all this work they want us to change out our 2 compartment sink for a 3 compartment “and” put in an additional prep sink. Our floor is not consistent with today’s codes so they said they would think about that. They want full achetectual and mechanical plans. They also want us to get our shelving back up to 32’ again. They are checking with their supervisor on whether they will require us to put in public restrooms.
Fun stuff.